PartzBiz CM: HYPLCUS11SASPA-Simpson Racing Hybrid Pro Lite
PartzBiz CM: HYPLCUS11SASPA-Simpson Racing Hybrid Pro Lite  PartzBiz CM: HYPLCUS11SASPA-Simpson Racing Hybrid Pro Lite  PartzBiz CM: HYPLCUS11SASPA-Simpson Racing Hybrid Pro Lite  PartzBiz CM: HYPLCUS11SASPA-Simpson Racing Hybrid Pro Lite  PartzBiz CM: HYPLCUS11SASPA-Simpson Racing Hybrid Pro Lite  PartzBiz CM: HYPLCUS11SASPA-Simpson Racing Hybrid Pro Lite  PartzBiz CM: HYPLCUS11SASPA-Simpson Racing Hybrid Pro Lite  PartzBiz CM: HYPLCUS11SASPA-Simpson Racing Hybrid Pro Lite  PartzBiz CM: HYPLCUS11SASPA-Simpson Racing Hybrid Pro Lite 
7024169/HYPLCUS11SASPA

Simpson Racing Hybrid Pro Lite

Available To Order
  • Brand Simpson Racing
  • Model HYPLCUS11SASPA
  • Availability Available To Order

  • Price$1,967.79

  • Ex Tax $1,839.05
Qty
SFI 38.1 certified, FIA 8858-2010 approved, the Hybrid Pro Lite is the ultimate in safety and comfort. The Hybrid Pro Lite's light-weight design and carbon fiber construction provides maximum comfort and maneuverability with superior strength.All of Simpson's Hybrid Series head restraints are designed for easily exiting the car without the danger of being entangled in other gear by offering the lowest profile of any comparable device. This device comes with optional patented SAS (Seatbelt Anchor System) for even greater coverage in flips, barrel rolls, and side impacts. When the worst happens, you'll have the same great protection every time. Ships race ready with Quick Release and D-ring Helmet Anchors.

References

Brand Simpson Racing
Category Safety Equipment
Product Code 7024169
SKU: HYPLCUS11SASPA

Specifications

Brand Simpson Racing
Emission Code 6
Product Type Head and Neck Restraint
Size Custom
Tether System Post Anchors / Tether Kit
Seatbelt Anchor System Yes

Specifications

Brand Simpson Racing
Emission Code 6
Product Type Head and Neck Restraint
Size Custom
Tether System Post Anchors / Tether Kit
Seatbelt Anchor System Yes
Loading...